My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-31_REPORT - M1980047
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980047
>
2012-10-31_REPORT - M1980047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:22 PM
Creation date
11/1/2012 6:46:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
REPORT
Doc Date
10/31/2012
From
ExxonMobile
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
SJR
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total acres <br />backfilled: <br />? 7S <br />Total acres <br />seeded w/ <br />approved mix: <br />Z(-.S' <br />Total acres <br />w /topsoil <br />replaced: <br />z? <br />Total acres <br />mulched w/ <br />approved mulch: <br />726.5-- <br />Total acres <br />$633.00 <br />Total acres <br />November 1, 2012 <br />Topsoil <br />6 _, €; <br />Mulch application <br />, <br />graded: <br />S 75' <br />fertilized w/ <br />2 6S <br />replacement <br />i'') , t46 f <br />rate (tons): <br />Avi? / <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Vsi. ^.i6J_0' iu- <br />Fertilizer <br />i ptc, r 3 °41,Azc1fT <br />Mulch <br />1/1,e_i j 4 Nen��,ti17 <br />application <br />method: <br />S£i41",6'. / Y4 - <br />rzfa%�W,, IC <br />application <br />method: <br />„� <br />117�� <br />application <br />method: <br />� y �� ,��,��� <br />Permittee Name: <br />Exxon Mobil Corporation <br />Permit Number: <br />M- 1980 -047 <br />Operation Name: <br />Colony Shale Oil Project <br />County: <br />Garfield <br />Annual Fee Due: <br />$633.00 <br />Anniversary Date: <br />November 1, 2012 <br />Permit Acreage: <br />5,712.05 <br />Current Bond Amt: <br />$30,000,000.00 <br />112 Annual Report <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). OYE NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). 6E5) NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES ■O <br />If "YES,” please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />` c0 <br />Page 2 of 3 <br />5. Does the mine operate more than 180 days per year YES NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES NO_ <br />b) approval for INTERMITTENT OPERATION? YES (NO) <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). c 27 <br />8. Number of acres that were newly affected during the current report year. U <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />U <br />O <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.