My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-06-14_GENERAL DOCUMENTS - C1981014
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981014
>
2001-06-14_GENERAL DOCUMENTS - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 3:39:06 PM
Creation date
10/31/2012 10:42:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
6/14/2001
Doc Name
Proposed Decision and Findings (RN-3)
From
DMG
Permit Index Doc Type
Findings
Email Name
JHB
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
undermined and no longer records data. Water levels are <br /> measured in the above listed wells on a quarterly basis . <br /> In addition to the parameters listed on Table 12 , the <br /> operator measures mine inflow, with inflow quantities, <br /> location and source identified on a semi-annual basis . <br /> All the sample results, mine inflow, and water depth are <br /> submitted to the Division in an Annual Hydrology Report. <br /> The ground water monitoring plan meets the requirements <br /> of Rule 4 . 05 . 13 (1) . See Exhibit 25 of the permit <br /> application for further information. <br /> 2 . The applicant will conduct monitoring of surface water in <br /> a manner approved by the Division. The monitoring plan <br /> was submitted under 2 . 05 . 6 (3 ) (b) (iv) and includes the <br /> following: <br /> Under the provisions of the NPDES permit, the operator <br /> will prepare and submit quarterly compliance reports on <br /> all discharge points at the mine and loadout sites . In <br /> the event of a discharge, selected water quality <br /> parameters will be taken and flow measured while samples <br /> will be taken weekly if discharge is occurring. <br /> Parameters analyzed can be found in Exhibit 25 of the <br /> permit application. <br /> In addition, surface flow (when conditions permit) will <br /> be measured both upstream and downstream of the mine and <br /> samples will be collected and analyzed quarterly for the <br /> following creeks : Magpie Creek, Newlin Creek, Second <br /> Alkali Creek and Oak Creek. Maps 12 and 13 show exact <br /> monitoring points . <br /> All monitoring information of surface and ground waters <br /> is submitted in the Annual Hydrology Report (see pages <br /> 2 . 05 . 6-52 through 54 of the permit application) . <br /> G. Transfer of Wells <br /> EFCI currently has no plans to transfer any exploration <br /> boreholes or monitoring wells for subsequent use as water <br /> wells . <br /> Southfield Mine Permit Renewal 03 <br /> 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.