Laserfiche WebLink
Status - Terminated <br /> The revised permit application, submitted in conjunction with the <br /> permit renewal and approved 11/27/89 , included a hydrologic <br /> monitoring plan as Exhibit 25 . <br /> STIPULATION NO. 3 <br /> WITHIN 180 DAYS OF PERMIT ISSUANCE THE OPERATOR SHALL PROVIDE <br /> DOCUMENTATION THAT THE APPROPRIATE FILINGS HAVE BEEN MADE WITH THE <br /> STATE ENGINEER' S OFFICE OR APPLICABLE WATER COURT REGARDING THE <br /> STORAGE AND CONSUMPTIVE USE OF WATER AT THE MINE. <br /> Status - Terminated <br /> This stipulation was reviewed during Permit Renewal 01, and was <br /> replaced with Stipulation 13 , November 27 , 1989 . <br /> STIPULATION NO. 4 <br /> WITH RESPECT TO THAT PORTION OF THE COAL LOAD-OUT LOCATED WEST OF <br /> THE COUNTY ROAD 79 IDENTIFIED AS AN ALLUVIAL VALLEY FLOOR, WITHIN <br /> TWO YEARS AFTER THE COMMENCEMENT OF THE PERIOD OF EXTENDED <br /> LIABILITY AS SPECIFIED IN RULE 4 . 15 .7 (5) THE OPERATOR SHALL COMPARE <br /> THE SOIL CHARACTERISTICS OF THE RECLAIMED AREA WITH AN ADJACENT <br /> UNDISTURBED AREA. THIS COMPARISON SHALL BE SUFFICIENT TO VERIFY <br /> THAT THE INFILTRATION, PERMEABILITY, AND TEXTURAL CHARACTERISTICS <br /> OF THE RECLAIMED SOILS HAVE BEEN RE-ESTABLISHED SUFFICIENTLY TO <br /> RENDER THE AREA AS POTENTIALLY FLOOD IRRIGABLE. <br /> Status - In Compliance, Future Submittal <br /> Resolution of this stipulation is due two years after the <br /> commencement of the period of extended liability. The loadout has <br /> been closed and was reclaimed between July and November 1996 . A <br /> Phase I Bond Release was approved on 2 January 1998 . The area was <br /> redisturbed (reseeded) in 1999 and the period of extended liability <br /> has been restarted. <br /> STIPULATION NO. 5 <br /> THE OPERATOR SHALL MONITOR THE WATER LEVELS MONTHLY IN THE THOMPSON <br /> WELL WATER SOURCE BEGINNING 120 DAYS PRIOR TO PILLARING OR <br /> Southfield Mine Permit Renewal 03 <br /> 3 <br />