My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-06-14_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2001-06-14_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 4:05:34 PM
Creation date
10/31/2012 10:16:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
REVISION
Doc Date
6/14/2001
Doc Name
Proposed Decision and Findings
From
DMG
Type & Sequence
RN3
Email Name
JHB
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STIPULATION NO. 17 <br /> WITHIN 120 DAYS OF PERMIT REVISION APPROVAL, THE APPLICANT SHALL <br /> SUBMIT DESIGNS FOR THE MAGPIE CREEK CHANNEL IN COMPLIANCE WITH THE <br /> REQUIREMENTS OF RULE 4 . 05 .4 . THE DESIGNS SHALL INCLUDE PLAN VIEWS, <br /> LONGITUDINAL PROFILE, CROSS-SECTIONS AND CHANNEL PROTECTION DETAILS <br /> IN ORDER TO MEET THE REQUIREMENTS OF RULE 4 . 05 . 4 (4) . <br /> Status - Terminated <br /> In a letter dated August 22 , 1991, the operator, EFCI, requested <br /> that the deadline for this stipulation be tied to the approval, <br /> denial, or withdrawal of Technical Revision No. 9 . The Division <br /> agreed and requested that EFCI submit designs within thirty days <br /> following a decision on Technical Revision No. 9 (TR09) . TR09 was <br /> officially withdrawn on October 16, 1992 . In the Division' s Mid- <br /> term Review dated November 1992 , adequacy question No. 14 requested <br /> a response to this stipulation. The requested designs, plan views, <br /> longitudinal profile, cross-sections and channel protection details <br /> were included in Technical Revision No. 15, the response to the Mid- <br /> term review. TR15 was approved on December 1, 1993 . <br /> STIPULATION NO. 18 <br /> THE APPLICANT WILL SUBMIT TO THE DIVISION AN ANNUAL REPORT OF <br /> INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WITHIN THE MINE. THIS <br /> REPORT IS TO INCLUDE A MINE WORKINGS MAP SHOWING THE LOCATION AND <br /> QUANTITY OF INFLOW; A TABLE KEYED TO THE MINE MAP WHICH SHALL <br /> CONTAIN THE SOURCE (I .E. FAULT, FRACTURES, ETC . ) , QUANTITY, <br /> DURATION AND QUALITY (I .E. pH, ELECTROCONDUCTIVITY AND TEMPERATURE <br /> OF ALL INFLOWS; A TABLE CONTAINING RECORDS OF WATER DISCHARGED FROM <br /> THE MINE, CONSUMED IN THE MINE AND IMPORTED FOR USE WITHIN THE <br /> MINE; AND A DISCUSSION OF WATER BALANCE WITHIN THE MINE. THE <br /> INFLOW STUDY IS TO BE DONE DURING THE SPRING OF EACH YEAR WITH THE <br /> REPORT SUBMITTED BY AUGUST 1 . <br /> Status - Ongoing, in compliance <br /> This stipulation was added to the permit September 11, 1991, with <br /> the approval of Minor Revision 16, to coordinate the submittal of <br /> the Annual Inflow Report with the submittal of the Annual Hydrology <br /> Report. <br /> Southfield Mine Permit Renewal 03 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.