Laserfiche WebLink
October 19, 2012 C-1981-022/Elk Creek Mine BFB <br /> _� <br /> f, i <br /> Photo 2 —Methane Pumping Station with Pipe Connecting to the Electrical Generating Station <br /> a <br /> Photo 3 —Electrical Substation with Erosion Control Measures in Place <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 5 of 6 <br />