Laserfiche WebLink
Scraper Worksheet Cont'd Task # 009 Page 19 of 161 <br />Task description: <br />Site: New Elk Mine <br />COMPACTION WORK <br />Compact Coal Stockpile Footprints at Development Waste Pile <br />Permit Action: 2011 Midterm Review Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 010 State: Colorado <br />Date: 7/14/2011 County: Las Animas <br />User: JDM <br />Abbreviation: None <br />Filename: CO 12-020 <br />Agency or organization name: DRMS <br />feet <br />4.00 <br />mph <br />8.00 <br />HOURLY EQUIPMENT COST <br />16.3 <br />(5,280ft. /12in. /27cu.ft.) <br />Basic Machine: CAT 815F <br />passes <br />Horsepower: 240 <br />Compactor Type: Soil - tamping foot <br />Site Altitude: <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$40.03 <br />NA <br />Operating Cost/Hour: <br />$63.29 <br />100 <br />Operator Cost/Hour: <br />$23.56 <br />NA <br />Total Unit Cost/Hour: <br />$126.88 <br />Total Fleet Cost/Hour: <br />$126.88 <br />MATERIAL QUANTITIES <br />Loose volume: 35,350 <br />LCY <br />Shrinkage factor: 0.870 <br />Compacted volume: 30,755 <br />CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Unadjusted hourly production = (W x S x L x C) / P <br />6.42 <br />feet <br />4.00 <br />mph <br />8.00 <br />inches <br />16.3 <br />(5,280ft. /12in. /27cu.ft.) <br />4 <br />passes <br />837.17 <br />CCY /hour <br />Site Altitude: <br />7,500 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Compactor(s) <br />Unit cost: $0.183 per CCY <br />694.85 CCY/Hour <br />694.85 CCY/Hour <br />Total job time: 44.26 Hours <br />Total job cost: $5,616.00 <br />CIRCES Cost Estimating Software <br />