Laserfiche WebLink
050 <br />051 <br />052 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />067 <br />068 <br />069 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />082 <br />085 <br />086 <br />087 <br />088 <br />090 <br />095 <br />100 <br />101 <br />102 <br />103 <br />104 <br />106 <br />110 <br />111 <br />112 <br />113 <br />114 <br />115 <br />133 <br />134 <br />135 <br />Cost Summary Worksheet Cont'd Task # MT6 Page 2 of 4 <br />Re grade West Portal Containment Area 2 <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />3 <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />7.77 <br />Re grade All Ditches at West Portal <br />DOZER <br />15.87 <br />Re grade All Ditches at Refuse Disposal Area <br />DOZER <br />1.13 <br />Replace Topsoil to Pond 004 <br />SCRAPERI <br />4.43 <br />Replace Topsoil to Completed Development Waste <br />Pile <br />SCRAPERI <br />10.10 <br />Replace Topsoil to Remaining Development Waste <br />Pile <br />SCRAPERI <br />3.52 <br />Replace Topsoil to Area East of Pond 5 <br />SCRAPERI <br />0.79 <br />Replace Topsoil to Pond 005 <br />SCRAPERI <br />1.06 <br />Replace Topsoil to Southwest Coal Stockpile <br />SCRAPERI <br />1.93 <br />Replace Topsoil to Area Along Highway 12 <br />SCRAPERI <br />1.91 <br />Replace Topsoil to Stockpiles South of Highway <br />12 <br />SCRAPERI <br />3.92 <br />Replace Topsoil to Area under Conveyor <br />SCRAPERI <br />2.11 <br />Replace Topsoil to Raw Coal Storage Stockpile <br />SCRAPERI <br />2.38 <br />Replace Topsoil to Small DR Area in Large DNR <br />Area <br />SCRAPERI <br />0.12 <br />Replace Topsoil from Prep Plant to Pond 007 <br />SCRAPERI <br />3.59 <br />Replace Topsoil to Clean Coal Stockpile <br />SCRAPERI <br />1.72 <br />Replace Topsoil to East Extension of River <br />Pum house <br />SCRAPERI <br />0.41 <br />Replace Topsoil to Embedded Waste Area <br />SCRAPERI <br />3.83 <br />Replace Topsoil to Topsoil Borrow Area <br />SCRAPERI <br />0.87 <br />Replace Topsoil to RDA Operational Surface <br />SCRAPERI <br />73.60 <br />Replace Topsoil to Four Bench Slopes <br />SCRAPERI <br />12.99 <br />Replace Topsoil to RDA Pond <br />SCRAPERI <br />20.09 <br />Replace Topsoil to RDA Access Road <br />SCRAPERI <br />6.70 <br />Replace Topsoil to Transformer and RockDust Cut <br />Slope <br />TRUCKI <br />2.94 <br />Replace Topsoil to Bates Portal Face-Up <br />SCRAPERI <br />5.61 <br />Replace To soil to Subsoil Stockpiles #2 and #3 <br />SCRAPERI <br />11.81 <br />Reseed Facilities Area with Rangeland Mix <br />REVEGE <br />178.00 <br />Reseed Disturbed Areas with Riparian Habitat <br />REVEGE <br />21.14 <br />Reseed Disturbed Areas with Riparian Habitat <br />REVEGE <br />95.25 <br />Reseed DWP with Rangeland Mix <br />REVEGE <br />11.24 <br />Weed Control - Assume 1/4 of Area Three Times <br />REVEGE <br />102.71 <br />Demolish and Remove All Structures <br />DEMOLISH <br />875.00 <br />Seal Portals and Vent Shafts <br />MINESEAL <br />270.00 <br />Backfill East Portal Face <br />DOZER <br />1.38 <br />Backfill West Portal Face <br />DOZER <br />1.38 <br />Backfill Bates Portal Face <br />DOZER <br />38.47 <br />Plug and Seal All Boreholes and Monitoring Wells <br />BOREHOLE <br />73.00 <br />Clean Ponds 004, 007, and 008 Twice During <br />Liability Period <br />TRUCKI <br />121.59 <br />Mobilize /Demobilize for Initial Reclamation <br />MOBILIZE <br />3.82 <br />Mobilize /Demobilize for Site Maintenance <br />MOBILIZE <br />3.82 <br />Mobilize /Demobilize for Pond Cleaning <br />MOBILIZE <br />3.82 <br />Mobilize /Demobilize for Pond Removal <br />MOBILIZE <br />3.82 <br />Seal and Abandon Three Slurry Wells MR95 <br />BOREHOLE <br />12.00 <br />Plug and Seal Drill Hole NE -16 -11 MR96 <br />BOREHOLE <br />4.00 <br />grade 3 development drill pads MR 107 <br />DOZER <br />0.86 <br />Seed 0.69 acres with Rangeland seed mix MR107 <br />REVEGE <br />1.00 <br />Backfill and Regrade Test Pits and Access Roads <br />M R99 <br />DOZER <br />4.63 <br />$1,604.79 <br />$3,276.89 <br />$233.39 <br />$911.67 <br />$6,523.99 <br />$2,273.20 <br />$529.14 <br />$218.32 <br />$1,281.16 <br />$1,276.48 <br />$2,616.78 <br />$1,346.41 <br />$1,537.97 <br />$82.26 <br />$2,376.89 <br />$1,093.75 <br />$269.74 <br />$2,556.00 <br />$586.22 <br />$45,500.43 <br />$8,030.56 <br />$4,137.30 <br />$4,143.04 <br />$1,532.32 <br />$3,467.74 <br />$7,300.51 <br />$119,754.68 <br />$86,974.31 <br />$216,339.04 <br />$7,091.23 <br />$19,264.29 <br />$1,854,900.37 <br />$203,945.92 <br />$855.68 <br />$855.68 <br />$23,836.67 <br />$18,565.12 <br />$52,102.10 <br />$9,445.03 <br />$13,905.62 <br />$10,435.58 <br />$3,221.87 <br />$8,494.19 <br />$2,701.53 <br />$141.62 <br />$1,418.91 <br />$723.07 <br />CIRCES Cost Estimating Software <br />