Laserfiche WebLink
Scraper Worksheet Cont'd Task # 006 Page 10 of 161 <br />Haul Route- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />1500.00 <br />4.00 <br />3.00 <br />7.00 <br />1568 <br />0.989 <br />Haul Time: 0.989 minutes <br />Return Route- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />1500.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2938 <br />0.567 <br />Loading Tool unit <br />Production 513.33 <br />Truck Unit Production <br />156.79 <br />Optimal No. of Trucks: 3 <br />Return Time: 0.567 <br />Total Truck Cycle Time: 3.536 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 390.40 <br />Adjusted single truck/loader team production: 390.40 <br />Adjusted multiple truck/loader team production: 390.40 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.386 /LCY <br />minutes <br />minutes <br />426.07 LCY /Hour <br />130.13 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY /Hour <br />LCY /Hour <br />Total job time: 56.03 Hours <br />Total job cost: $30,315.11 <br />CIRCES Cost Estimating Software <br />