Laserfiche WebLink
Page 8 of 161 <br />TRUCK/LOADER TEAM WORK <br />Task description: Backfill and Regrade Transformer and Rock Dust Cut Slope <br />Site: New Elk Mine Permit Action: 2011 Midterm Review Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado Abbreviation: None <br />Date: 7/12/2011 County: Las Animas Filename: C012 -003 <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Equipment Description <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: CAT 950G (2002) <br />Support Equipment -Load Area: Cat D8R Series II - 8SU (2005) <br />-Dump Area: Cat D8R Series II - 8SU (2005) <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Truck /Loader Team Sunnort Fauinment Maintenance Fauinment <br />Total work team cost/hour: $541.03 <br />h� t� Y if :��1[ilil:�►`� Il Y Y I i[.v <br />Initial volume: 17,500 CCY Swell factor: 1.250 <br />Loose volume: 21,875 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,650 Pounds /LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 13.36 LCY <br />Truck Bed (volume) Basis: <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />25 <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$12.25 <br />$19.34 <br />$45.97 <br />$39.08 <br />NA <br />NA <br />Operating cost/hour: <br />$49.41 <br />$33.20 <br />$20.28 <br />$81.13 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$1.59 <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.49 <br />$38.49 <br />$38.49 <br />NA <br />NA <br />Unit Subtotals: <br />$61.66 <br />$91.03 <br />$106.33 <br />$158.69 <br />NA <br />NA <br />Number of Units: <br />3 <br />1 <br />1 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $276.01 <br />Support: $265.02 <br />Maint: $0.00 <br />Total work team cost/hour: $541.03 <br />h� t� Y if :��1[ilil:�►`� Il Y Y I i[.v <br />Initial volume: 17,500 CCY Swell factor: 1.250 <br />Loose volume: 21,875 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,650 Pounds /LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 13.36 LCY <br />Truck Bed (volume) Basis: <br />CIRCES Cost Estimating Software <br />