My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-29_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-10-29_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:58 PM
Creation date
10/29/2012 1:39:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
10/29/2012
Doc Name
Cost Estimate (Part 2 of 2)
From
DRMS
To
Ron Thompson - New Elk Coal Company
Type & Sequence
MT6
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 95F <br />Date: 10/22/2012 <br />User: JHB <br />UNIT COSTS <br />DEMOLITION WORK <br />Demolition for MR97 <br />Permit Action: 2011 Midterm Review Permit/Job #: C1981012 <br />State: Colorado <br />County: Las Animas <br />Agency or organization name: DBMS <br />Abbreviation: None <br />Filename: C012 -95f <br />Location adjustment: 94.00 % <br />Structure or Item <br />Dimensions <br />Demolition Menu <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Description <br />Selection <br />Cost <br />200 Foot Conveyor <br />200 LF <br />Conveyor, elevated, <br />200.00 <br />LF <br />$42.26 <br />$8,452.00 <br />Extension <br />including supports - 5 ft. <br />W x 6 ft. H housing <br />Radial Stacker <br />300 <br />Conveyor, elevated, <br />300.00 <br />LF <br />$42.26 <br />$12,678.00 <br />Convyors <br />including supports - 5 ft. <br />W x 6 ft. H housing <br />Radial Stacker Pads <br />3 X 3 X 1 <br />Demo. and on -site <br />18.00 <br />SF <br />$3.11 <br />$55.98 <br />disposal in existing pit, <br />12 in. thick - Max. 50 ft. <br />push <br />Conveyor Tube <br />80 X 10 dia <br />Bldg. (SN) demo. /on- <br />6,283.00 <br />CF <br />$0.17 <br />$1,055.54 <br />site disposal in existing <br />pit or cut - Max. 10,000 <br />ft. haul <br />Temporary Conveyor <br />500 LF <br />USER PROVIDED <br />1.00 <br />EA <br />$1,000.00 <br />$1,000.00 <br />Removal <br />ITEM <br />Electrical Substation <br />32 X 17 X 6 <br />Bldg. (SN) demo. /on- <br />3,360.00 <br />CF <br />$0.17 <br />$564.48 <br />site disposal in existing <br />pit or cut -Max. 10,000 <br />ft. haul <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 30.00 (unadjusted): $23,806.00 location): $22,377.64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.