Laserfiche WebLink
Task description: <br />Site: New Elk Mine <br />Page 44 of 51 <br />BULLDOZER WORK <br />Replace 24" Topsoil TR66 <br />Permit Action: 2011 Midterm Review Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 170 State: Colorado <br />Date: 10/24/2012 County: Las Animas <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Abbreviation: None <br />Filename: CO 12-170 <br />Total unit Cost /Hour: $251.56 <br />Total Fleet Cost /Hour: $251.56 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,517 <br />Swell factor: 1.429 <br />Loose volume: 6,453 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />2,110.5 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: 5% <br />Average site altitude: 7,450 feet <br />Material weight: 1,600 Ibs /LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Source <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost /Hour: <br />$72.40 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost /Hour: $251.56 <br />Total Fleet Cost /Hour: $251.56 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,517 <br />Swell factor: 1.429 <br />Loose volume: 6,453 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />2,110.5 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: 5% <br />Average site altitude: 7,450 feet <br />Material weight: 1,600 Ibs /LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Source <br />CIRCES Cost Estimating Software <br />