Laserfiche WebLink
Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.800 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3458 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />294.83 LCY /hr <br />294.83 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.706 /LCY <br />Total job time: <br />Total job cost: <br />55.40 Hours <br />$11,535.54 <br />Page 18 of 51 <br />CIRCES Cost Estimating Software <br />