My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-29_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-10-29_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:58 PM
Creation date
10/29/2012 1:39:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
10/29/2012
Doc Name
Cost Estimate (Part 2 of 2)
From
DRMS
To
Ron Thompson - New Elk Coal Company
Type & Sequence
MT6
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />Page 10 of 51 <br />BULLDOZER WORK <br />Replace Topsoil on Six Drill Pads and Mud Pits MR114 <br />Permit Action: 2011 Midterm Review Permit /Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 147 State: Colorado <br />Date: 10/23/2012 County: Las Animas <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D7R DS Series 11 LGP <br />238 <br />Straight <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: 0012 -147 <br />Total unit Cost/Hour: $165.04 <br />Total Fleet Cost /Hour: $165.04 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Utilization % <br />Ownership Cost /Hour: <br />$46.30 <br />Loose volume: <br />NA <br />Operating Cost/Hour: <br />$80.25 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $165.04 <br />Total Fleet Cost /Hour: $165.04 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />2,200 <br />Swell factor: <br />1.125 <br />Loose volume: <br />2.475 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Division Estimate <br />Cat Handbook <br />Average push distance: 125 feet <br />Unadjusted hourly 428.6 LCY /hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 5 % <br />Average site altitude: 7,600 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.