My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-29_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-10-29_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:58 PM
Creation date
10/29/2012 1:39:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
10/29/2012
Doc Name
Cost Estimate (Part 2 of 2)
From
DRMS
To
Ron Thompson - New Elk Coal Company
Type & Sequence
MT6
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />BULLDOZER WORK <br />Six Drill Pads and Mud Pits MR114 <br />Permit Action: 2011 Midterm Review <br />PROJECT IDENTIFICATION <br />Task #: 146 State: Colorado <br />Date: 10/23/2012 County: Las Animas <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY E0 <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D7R DS Series II LGP <br />238 <br />Straight <br />NA <br />1 per day <br />(CRG) <br />Page 8 of 51 <br />Permit/Job #: C 1981012 <br />Abbreviation: None <br />Filename: CO 12-146 <br />Total unit Cost/Hour: $165.04 <br />Total Fleet Cost /Hour: $165.04 <br />MATERIAL OUANTITIES <br />Initial Volume: 3,350 <br />Swell factor: 1.165 <br />Loose volume: 3,903 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />125 feet <br />428.6 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 5 % <br />Average site altitude: 7,600 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$46.30 <br />NA <br />Operating Cost/Hour: <br />$80.25 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $165.04 <br />Total Fleet Cost /Hour: $165.04 <br />MATERIAL OUANTITIES <br />Initial Volume: 3,350 <br />Swell factor: 1.165 <br />Loose volume: 3,903 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />125 feet <br />428.6 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 5 % <br />Average site altitude: 7,600 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.