My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-29_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-10-29_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:58 PM
Creation date
10/29/2012 1:39:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
10/29/2012
Doc Name
Cost Estimate (Part 2 of 2)
From
DRMS
To
Ron Thompson - New Elk Coal Company
Type & Sequence
MT6
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip DWDA Expansion Area MR112 <br />Site: New Elk Mine Permit Action: 2011 Midterm Review Permit /Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 140 State: Colorado <br />Date: 10/23/2012 County: Las Animas <br />User: JHB <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Ripper Attachment: 1 -Shank Ripper <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: CO 12 -140 <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost /Hour: <br />$81.85 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper Operating Cost/Hour: <br />$9.64 <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total Unit Cost/Hour: <br />$270.66 <br />Total Fleet Cost /Hour: <br />$270.66 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA <br />BCY NA <br />Area: 0.60 acres Rip Depth (ft): 2.00 <br />Volume: 1,936 BCY or CCY <br />Source of estimated quantity: <br />Operator Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />4.05 <br />mph <br />Average Ripping Width: <br />6.08 <br />degrees <br />Average Ripping Length: <br />100.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.604 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.604 <br />Acres /hr <br />Site Altitude: <br />7,500 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift /day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.50 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.50 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />1.20 Hours <br />Unit cost: $539.829 Per acre <br />Total job cost: <br />$324.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.