My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-29_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-10-29_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:58 PM
Creation date
10/29/2012 1:39:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
10/29/2012
Doc Name
Cost Estimate (Part 2 of 2)
From
DRMS
To
Ron Thompson - New Elk Coal Company
Type & Sequence
MT6
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 95B <br />Date: 10/22/2012 <br />User: JHB <br />UNIT COSTS <br />DEMOLITION WORK <br />Demo tasks from MR110 <br />Permit Action: 2011 Midterm Review Permit /Job #: C1981012 <br />State: Colorado <br />County: Las Animas <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C012 -95b <br />Location adjustment: 94.00 % <br />Structure or Item <br />Dimensions <br />Demolition Menu <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Description <br />Selection <br />Cost <br />East Portal Intake <br />20' X14' X 20' <br />Bldg. (SN) demo. /on- <br />1,080.00 <br />CF <br />$0.17 <br />$181.44 <br />Heater Removal <br />site disposal in existing <br />pit or cut -Max. 10,000 <br />ft. haul <br />- Heater Removal (2) <br />6,000 LB <br />USER PROVIDED <br />2.00 <br />EA <br />$1,800.00 <br />$3,600.00 <br />ITEM <br />East Portal Propane <br />12,000 LB <br />Excavate and load tank <br />1.00 <br />EA <br />$515.00 <br />$515.00 <br />Tank <br />onto trailer, non - leaking <br />- 3,000 gal. to 5,000 gal. <br />- Concrete Pads <br />18'X 8'X F <br />Pavement, concrete, <br />5.30 <br />CY <br />$112.00 <br />$593.60 <br />demolition only, 7 in. to <br />24 in. thick - Reinforced <br />-Fence <br />20'X 20'X 6' <br />Fencing, chain link, <br />80.00 <br />LF <br />$2.35 <br />$188.00 <br />including posts and <br />fabric - to 6 ft. high <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 22.00 (unadjusted): $5,078.04 location): $4,773.36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.