Laserfiche WebLink
October 25, 2012 C-1982-056/Foidel Creek Mine JDM <br /> initiation of the next Phase. No problems were noted at the RDA. <br /> RDA Expansion Outslope <br /> RDA Expansion Diversion Ditch Stockpiled Refuse on Second Lift <br /> ROADS —Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.l(4)/4.03.2(4) Surfacing and <br /> Maintenance4.03.1(5) and(6)/4.03.2(5) and(6) Reclamation 4.03.1(7)/4.03.2(7): <br /> Roads throughout the mine site were wet but stable at the time of the inspection. All roads were in good condition <br /> with no problems noted,with the exception of the following: <br /> - The October 1,2012 roadside ditches along the west side of the 16 LT road towards the beginning of the road <br /> stated that they will need to be reestablished to clear sediment build-up along the length of the access road. This <br /> work has been completed. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 4 <br />