My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-26_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-10-26_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:52 PM
Creation date
10/29/2012 7:51:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
10/26/2012
Doc Name
Adequacy Letter
From
DRMS
To
Ms. Tamme Bishop J.E. Stover & Associates, Inc.
Type & Sequence
TR75
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />October 26, 2012 <br />Ms. Tamme Bishop <br />J.E. Stover & Associates, Inc. <br />23 52 North 7th Street, Unit B <br />Grand Junction CO 81501 <br />Re: Bowie No. 2 Mine (Permit No. C- 1996 -083) <br />Technical Revision No. 75 (TR -75) <br />As -Built Configuration for Gob Pile ##4 <br />Dear Ms. Bishop: <br />COLORADO <br />ID IV I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division has reviewed the above referenced technical revision application submitted for the <br />as -built configuration of Gob Pile 94, and has the following adequacy review questions and <br />comments. <br />Rule 2.05.3(4) — Operations Plan for Ponds, Impoundments, Other Treatment Facilities and <br />Diversions <br />1. Maps 15 -3, 18, and 21 -3 and Figure 2 of Volume IX do not show Ditch D -F21. Please <br />revise the maps to include the ditch, as required by Rule 2.05.3(4)(i)(B). <br />2. Cross - section U -U' has been removed from Map 18. A cross - section exists on Map <br />18 for Sections L through T, and a note under that section indicates that all other <br />cross - sections are shown on Map 19. Map 19 does not include Section U, nor are we <br />able to locate the section elsewhere in the permit application package. We are also <br />unable to locate Sections V, W, and X. Please revise Map 18 to include the required <br />cross - sections (Rule 2.05.3(4)(i)(B)) for sections U, V, W, and X, or provide <br />information on their location in the permit application package. <br />3. The first page of Volume IX, Appendix B includes the required certification (Rule <br />2.05.3(4)(i)(A)) of the design information in the appendix. The certification notes that <br />it pertains to all designs with a date of 04/09. Please add a certification for the <br />structures revised after the current April 15, 2009 certification. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.