Laserfiche WebLink
The Dilts Quarry and the Boettcher Sandstone Quarry were both surveyed for noxious <br />weeds and all existing infestations appear to be under control but we do recommend future <br />monitoring of these quarries to assure no re- growth in the future occurs. <br />I have also attached a summary of the total hours our crew worked on the properties <br />broken down into equipment, as well as total acres treated and herbicide(s) used. Several <br />pictures of the site are attached below, but if it is necessary to see more, please don't hesitate <br />to ask. <br />Summary Breakdown: <br />ATV application hours: 157.5 hrs <br />John deer Gator + 30' hose reel: 19 hrs <br />Backpack applicators: 27 hrs <br />Total labor hours: 203.5 hrs <br />Herbicide Usage: <br />Perspective: 212.65 total ounces <br />Overdrive: 204.52 total ounces <br />Paramount: 32 total ounces <br />MSO (adjuvant): 886.08 total ounces <br />Grounded (drift deposition): 102.08 total ounces <br />Highlight: 136.52 total ounces <br />Total acres treated during the 2012 spray season was 51.13 acres <br />