My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-24_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2012-10-24_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:46 PM
Creation date
10/25/2012 9:32:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
10/24/2012
Doc Name
3rd Quarter 2012 West Pit Fill Monitoring Report
From
Zack Trujillo
To
Rob Zuber
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
RDZ
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interoffice Memorandum <br />To: Rob Zuber <br />From: Zach Trujillo <br />Subject: Colowyo — Third Quarter 2012 West Pit Fill Monitoring Report <br />Date: 10/24/2012 <br />••• <br />After my review of the Third Quarter West Pit Fill Monitoring Report for the year 2012, 1 find the report in compliance <br />with the following rules: <br />1. 4.09.1(11)(a) —The fill was inspected for stability by a registered engineer during the placement and compaction <br />of fill materials. <br />2. 4.09.1(11)(b) —The qualified registered engineer provided to the Division a certified report within two weeks <br />after the inspection that the fill is being constructed as specified in the design approved by the Division. The <br />South Taylor Fill was inspected on September 13, 2012 and the Quarterly Fill Monitoring Report was received by <br />the Division on September 19, 2012. No appearances of instability, structural weakness, and other hazardous <br />conditions were noted in the inspection report. <br />3. 4.09.1(11)(c) — Rule 4.09(11)(c) is no longer applicable during this stage of fill construction. <br />The 2012 Third Quarter West Pit Fill Monitoring Report for Colowyo Mine meets all rules required by the Division. If you <br />have any questions, feel free to contact me. <br />Sincerely, <br />Zach <br />
The URL can be used to link to this page
Your browser does not support the video tag.