Laserfiche WebLink
PROJECT: RPEE <br />LOCATION: Somerset <br />CLIENT: Mountain Coal Company <br />RELATIVE COMPACTION TEST RESULTS <br />PROJECT NO: M12005MT <br />ENGINEERING TECHNICIAN: ,Hayes <br />NUCLEAR GAUGE USED: 18 <br />DATE: Wednesday Aug /1/2012 <br />Thursday, Aug /2/2012 <br />REMARKS: The test results indicate only the density and moisture content for the location and elevation tested only. <br />Fututhert met Azzoriatez <br />PROJECT NUMBER: M12005MT <br />TEST LOCATION <br />DEPTH OR <br />ELEVATION <br />PROBE <br />DEPTH <br />(IN) <br />LABORATORY <br />PROCTOR <br />DENSITY <br />(PCF) <br />OPTIMUM <br />MOISTURE <br />CONTENT <br />( %) <br />DRY <br />DENSITY <br />(PCF) <br />MOISTURE <br />CONTENT <br />( %) <br />RELATIVE <br />COMPACTION <br />( %) <br />SOIL TYPE <br />Wednesday, Aug, 1/2012 <br />241 <br />RPEE -01 <br />8 <br />97.5 <br />12.0 <br />96.5 <br />15.6 <br />99 <br />Coal gob, black <br />242 <br />RPEE -02 <br />8 <br />97.5 <br />12.0 <br />95.3 <br />18.0 <br />98 <br />" " <br />243 <br />RPEE -03 <br />Thursday, Aug, 2/2012 <br />8 <br />97.5 <br />12.0 <br />107.0 <br />16.5 <br />100 <br />,, <br />244 <br />RPEE - 01 <br />8 <br />97.5 <br />12.0 <br />94.7 <br />20.4 <br />97 <br />" <br />245 <br />RPEE - 02 <br />8 <br />97.5 <br />12.0 <br />96.9 <br />17.0 <br />99 <br />" " <br />246 <br />RPEE - 03 <br />8 <br />97.5 <br />12.0 <br />96.1 <br />19.7 <br />99 <br />« ,, <br />PROJECT: RPEE <br />LOCATION: Somerset <br />CLIENT: Mountain Coal Company <br />RELATIVE COMPACTION TEST RESULTS <br />PROJECT NO: M12005MT <br />ENGINEERING TECHNICIAN: ,Hayes <br />NUCLEAR GAUGE USED: 18 <br />DATE: Wednesday Aug /1/2012 <br />Thursday, Aug /2/2012 <br />REMARKS: The test results indicate only the density and moisture content for the location and elevation tested only. <br />Fututhert met Azzoriatez <br />PROJECT NUMBER: M12005MT <br />