My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-05_PERMIT FILE - C1982057A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057A
>
2012-09-05_PERMIT FILE - C1982057A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:38 PM
Creation date
10/23/2012 9:25:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
9/5/2012
Doc Name
Pond 016 Area Slide Remediation Plan
Section_Exhibit Name
Tab 20 Attachment 20-D
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• INTRODUCTION <br />Attachments 20 -D and 20 -E have been consolidated into Attachment 20 -D to address the <br />remediation plan for the entire area associated with the Pond 016/016A slope instability <br />and the "Shrub Plot" slumps. The purpose of this remediation plan is to effectively <br />stabilize the slide areas by containing and conveying the surface water /groundwater away <br />from the saturated areas. A Geotechnical Evaluation and Stabilization/Reconstruction <br />Recommendations Report, prepared by Northwest Colorado Consultants, Inc (NWCC), <br />based on 2008 drilling program, 2009 monitoring and May 2010 observations, is <br />attached. <br />There are a number of factors involved with stabilizing the area: <br />• A portion of permanent Road J/K will be relocated <br />• Pond 016 slide will be stabilized <br />• Shrub Plot slump will be stabilized <br />• Pond 016A will be eliminated by backfilling <br />• Pond 016 capacity verification <br />• Permanent Channel PM -2 will be relocated and extended through the Pond 016A area <br />• Expansion of the disturbance area <br />REIVIEDIATION PLAN <br />• Relocation of Roads J/K <br />A portion of the J and K roads will be relocated through the slide areas once the <br />remediation trench and the permanent channels are constructed. <br />The new road will be approximately 20 feet wide with an overall grade of not more than <br />10 percent. See Exhibit 20 -13.1, Pond 016 Area Remediation Plan— Existing Conditions, <br />for current road locations and 20 -D.2, Pond 016 Area Remediation Plan and Post Mine <br />Cross - Sections, for the proposed relocation and profile of the landowner access road. <br />The typical construction details for access roads are contained in Tab 13, Transportation <br />Facilities. <br />DRMS is requiring stricter construction criteria than is currently approved in Tab 13. <br />These criteria that SCC must adhere to include: <br />• Materials will be placed in approximate 12 inch lifts <br />• Compaction will achieve a minimum of 95% MDD <br />• Materials placed in the road fill will be in an approximate range of +/- 2% OMC <br />• A sheepsfoot roller will be used, if necessary, to achieved the required level of <br />compaction <br />Pond 016 Slide Remediation <br />Beginning at or above the slide scarp, the slope will be excavated back into competent <br />material and proceed down the face of the slope to the approximate water source located <br />• during the geotechnical drilling program. Additional disturbance is proposed to allow an <br />adequate buffer and equipment access around the area to stabilize the area. <br />TR -73 1 6111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.