Laserfiche WebLink
Exhibit F <br />Other Permits & Licenses <br />CM -25 Mine Permit Amendment <br />M- 1977 -307 <br />The following are additional permits and environmental plans required for CM -25: <br />1) The mining area is zoned "agriculture" by Montrose County. Cotter has a <br />conditional use permit issued by the Montrose County Commissioner's Office. <br />2) The mineral lease between U.S. Department of Energy and Cotter Corporation <br />requires Cotter to notify and receive approval from DOE of any modifications to <br />Cotter's mining plan. This will include obtaining DOE approval for the proposed <br />ventilation hole sites. <br />3) Cotter will modify its Stormwater Discharge Permit as needed. <br />4) Cotter will apply for an air emissions permit from CDPHE if it is determined that <br />this is required. <br />5) An explosives permit will be requested from the Department of Treasury, Bureau <br />of ATF prior to the resumption of mining. <br />