My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-01_PERMIT FILE - C1982057 (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057
>
2011-07-01_PERMIT FILE - C1982057 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:08 PM
Creation date
10/23/2012 7:26:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
7/1/2011
Doc Name
Pond 016 Spillway Certifiation
Section_Exhibit Name
Tab 13 Attachment 13-5F Appendix 1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Pond 016 S~illw~ Certification <br />This report provides updated SEDCAD demonstrations and current elevations for the <br />embankment, principal spillway, and emergenry spillway for Pond 016. The report was <br />originally certified in May 2005, as part of Technical Revision No. 53, by Robert J. <br />Shevling, a Colorado registered professional engineer familiar with construction and <br />maintenance of earthen embanlffiments. This revised certification only pereains to an <br />incorrect reference to the As-Built Drawing, Exhibit 13-9A. <br />The purpose of my inspection and certification is to ensure coaect and accurate spillway <br />elevations based on the accompanying certified SEDCAD demonstrations. <br />The capacity of the Sediment Pond is attributed partially to the embankment and partially to <br />the pond excavation. 11me embankment construction techniques and resulting stability <br />analyses were previously certified and have not changed. During passage of the 10-yeaz, 24 <br />hour storm event no flow is discharged through the emergency spillway as shown on Exhibit <br />13-9A and in the SEDCAD demonstrations. The structure elevations shown on Exhibit 13- <br />9A have been verified by physical surveying. <br />Pond 016 functions in conjunction with PondO16A and this system meets or exceeds the <br />design and performance requirements of the Colorado Mnne Land Reclamation Boazd for <br />Coal Miniug rules and regulations. SCC inspects the pond quarterly to evaluate structural <br />integrity, storage capacity conditions, and remedial work requirements in accordance with the <br />approved permit conditions. <br />To the best of my knowledge, the field adjustments made to abate CV-2005-003 aze in <br />conformance with the updated designs and specifications. <br />~s <br />(date) <br />\\\\ ~POQII IRI~C ~S ~////~ <br />Q~; O P.~ Herj •, ~~~ <br />.ti <br />~_ <br />~~°18406~i~- <br />~1~~ <br />'A L <br />~IIII~~ <br />TR-56 <br />Revised 9/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.