My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-23_PERMIT FILE - C1982057A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057A
>
2012-01-23_PERMIT FILE - C1982057A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:47 PM
Creation date
10/23/2012 7:23:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
1/23/2012
Doc Name
Pond 016 Slide Remediation Plans
Section_Exhibit Name
Tab 20 Attachment 20-D
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
failure area will also probably occur. <br />The original failure surface appears to be located near the toe of the original natural slope, which was undercut <br />by the excavation for Pond 16. The removal of the soils from this area and the placement of the fill materials <br />for the haul road, which was located uphill of the pond cut most likely initiated the failure by removing support <br />from the toe of the slope and adding additional driving forces. The failure of the Series 24 wells in 2002/2003 <br />indicates that the slide was active, even though no visible signs of failure were observed in the present failure <br />area We also believe that the regrading that occurred in 2007, as the haul road was reclaimed, increased the <br />driving forces on the upper portion of the slope failure thus causing the current slope failure. <br />The failure of these overburden soils and weathered claystone materials is most likely a result of the <br />groundwater seepage occurring within the overburden soils and highly weathered claystone materials, as well <br />as the additional loads applied to the upper portion of the failure by the placement of fill materials over the <br />marginally stable natural soils. Loss of support created by the formation of the head scarp and downslope <br />movement of the debris flow has contributed to the uphill propagation of the failure. <br />0 Preliminary Stabilization/Reconstruction Recommendations <br />Based on the bedrock and groundwater surface maps that have been developed with the information obtained <br />from the test holes/wells and our observations of the bedrock and groundwater conditions encountered in test <br />pits, it appears that the groundwater, which we believe is a major contributor to the slope failure, is flowing in <br />a south to southwest direction. The thickness of the highly weathered claystone materials, in which the <br />groundwater is flowing, is highly variable and does not appear to be dipping to the west- northwest as does the <br />underlying bedrock materials. <br />Based on the groundwater and bedrock conditions observed to this date, we believe that it is imperative that an <br />underdrain/cutoff trench be constructed along the north and east sides of the failure to intercept and divert the <br />water away from the failed area. We believe that if the groundwater is adequately diverted from the failure <br />area, the amount of regrading and buttress construction required at the lower portion of the slide can be <br />substantially reduced. <br />We strongly recommend that two test trench/pits be constructed at the site at the approximate locations shown <br />in Figure #10 to provide additional information on the depth and condition of the bedrock materials and <br />• groundwater flows. We recommend that the base of the trenches be excavated at least 2 feet into the <br />Job Number: 08-8099 NWCC, Inc. Page 8
The URL can be used to link to this page
Your browser does not support the video tag.