My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-11-08_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-11-08_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 7:31:01 PM
Creation date
10/22/2012 10:32:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/8/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN.21 '96 2:33PM DMG,GJCT 1 303 2410336 P.8 <br /> latch bar and lock chamber shall be as detailed on Standard Drawing Number 9. Gaps in fence <br /> for manufactured gates will not be measured for payment of the fence, <br /> 19.4 MEASUREMENT AND PAYMENT <br /> Fencing, including wire gates, shall he measured to the nearest linear foot. <br /> Payment for each type of fence contraction will be made at the unit price for that type of work. <br /> Such payment will,constitute full compensation for all labor, materials, equipment and all other <br /> items necessary and incidental to the performance of the work including concrete, fasteners, <br /> making all special crossings of narrow and wide water courses, and fabricating and installing all <br /> wire gates, and revegetation of disturbed areas. <br /> Payment for furnishing and installing each type and size of manufactured gate will be made at <br /> the unit price for that type and size of gate. Such payment will constitute full compensation for <br /> all labor, materials, equipment and all other items necessary and incidental to the complete <br /> installation, including all gate posts with concrete bases, hinges, latches and lock chambers, and <br /> all other appurtenances, and painting all exposed meal surfaces as specified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.