My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-07-22_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-07-22_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 5:25:41 PM
Creation date
10/22/2012 10:31:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/22/1996
Doc Name
Bid Documents (IMP) 1996 Maintenance Project
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equipment must be in good operating condition and must be maintained in good operating <br /> condition by the CONTRACTOR throughout the life of the contract. The PROJECT MANAGER <br /> shall be the sole judge of whether equipment is or is no in "good operating condition". <br /> The number of hours indicated in the Special Conditions and on the Invitation and Bid Sheet <br /> are estimated. It is impossible to determine in advance the actual number of hours that the <br /> equipment will be required to be used, or to guarantee that any equipment rental will be <br /> necessary. <br /> Calculations for FHP Adjustments <br /> Equipment of any size above the minimum flywheel horsepower may be furnished subject to <br /> the approval of the PROJECT MANAGER. In order to evaluate the bids for various sizes of <br /> equipment proposed to be furnished by the bidders, the unit price inserted in the bid must be <br /> adjusted. The bidder may figure the unit price to insert in the Invitation and Bid by doing the <br /> following computation for the applicable bid item: <br /> (Rate you want per hour) X (Requested FHP) = Price on Bid Schedule <br /> (The FHP of your machine) <br /> EXAMPLE: If the desire unit rate to be received is $70.00/hour for a 215 FHP bulldozer and the <br /> minimum FHP requested is 140, then multiply $70.00 x 140/215 = $45.50 per hour. <br /> Use that calculated amount ($45.50 in the example) as the unit price on the Invitation and Bid. <br /> If the CONTRACTOR plans to furnish a machine other than the minimum FHP listed on the <br /> Invitation and Bid, he must write the FHP of the machine, in ink, under the bid item on the <br /> Invitation and Bid, or include it on the List of Equipment Offered form. <br /> After the successful bidder has furnished evidence of the FHP capacity of the equipment to be <br /> used, the amount bid for Equipment Rental will be modified by reversing the above procedure <br /> to reflect the unit price desired by the CONTRACTOR with a corresponding reduction in the <br /> quantity of hours required. This modified hourly rate an number of hours will appear on the <br /> Purchase Order. <br /> 19.3 Execution <br /> Operators <br /> The equipment shall be furnished complete with competent operating personnel. Operators <br /> shall be qualified to perform all work under this specification in a skillful and professional <br /> manner. The OWNER may, in writing, require the CONTRACTOR to remove from the work any <br /> employee the OWNER deems incompetent or careless. The OWNER will be the sole judge of <br /> the acceptability of any employee. <br /> Supervision <br /> The CONTRACTOR shall be responsible for the supervision of all mechanical operations of the <br /> equipment including proper maintenance. Equipment maintenance, fueling and repairs shall be <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.