Laserfiche WebLink
1996 Coal Basin Maintenance and Snow Removal Telephone Bid Revised 3/1/96 <br /> C-81-017 <br /> Bid Schedule <br /> Item Description Quantity* Unit Unit Price Total Cost** Unit Price <br /> (estimated (hours, bales, (first 8 hrs. to (additional <br /> total units) feet) incl. hrs. beyond <br /> mob/demob) (CxE= total first 8 hrs, <br /> cost) no <br /> mob/demob) <br /> A B C D E F G <br /> 1 D7H <br /> Dozer/215 fhp 24 hrs. $ $ $ /Hr_ <br /> equivalent /Hr. <br /> w/operator <br /> 2 416B backhoe/ <br /> loader or 74 <br /> flip equivalent 24 hrs. $ $ $ /Hr. <br /> w/operator /Hr. <br /> 3 10 cubic yard <br /> on/off highway 8 hrs. $ $ $ /Hr. <br /> dump truck /Hr. <br /> w/operator <br /> 4 14G Motor <br /> Grader or 200 16 hrs. $ $ $ /Hr. <br /> flip equivalent /Hr. <br /> w/operator <br /> 5 Prefabricated <br /> Silt Fence per <br /> lineal foot 300 L. Ft. $ $ N/A <br /> installed /L. Ft. <br /> 6 Straw Bales 100 bales $ $ N/A <br /> with rebar per /bale <br /> bale installed <br /> GRAND TOTAL $ <br /> (Total of Column F) <br /> * For bid evaluation only, hours are N T guaranteed. <br /> Contractor Date <br /> Signature Phone <br /> Address <br /> USE THIS FORM TO SUBMIT YOUR BID <br />