My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-07-22_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-07-22_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 5:25:41 PM
Creation date
10/22/2012 10:31:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/22/1996
Doc Name
Bid Documents (IMP) 1996 Maintenance Project
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the unit price desired by the CONTRACTOR with a corresponding reduction in the quantity of <br /> hours required. This modified hourly rate and number of hours will appear on the Purchase Order. <br /> 19.3 EXECUTION <br /> Operators <br /> The equipment shall be furnished complete with competent operating personnel. Operators shall <br /> be qualified to perform all work under this specification in a skillful and professional manner. The <br /> OWNER may, in writing, require the CONTRACTOR to remove from the work any employee the <br /> OWNER deems incompetent or careless. The OWNER will be the sole judge of the acceptability <br /> of any employee. <br /> Supervision <br /> The CONTRACTOR shall be responsible for the supervision of all mechanical operations of the <br /> equipment including proper maintenance. Equipment maintenance, fueling and repairs shall be done <br /> sot that spilling of lubricants and fuel is minimized. <br /> Performance of Work <br /> Supplemental work shall be performed after the general construction work in that particular area <br /> and shall consist of general earthmoving or other finishing work as may be directed by the <br /> PROJECT MANAGER. <br /> All operations under this section will be under the direct supervision of the PROJECT MANAGER <br /> and work under this section shall be performed only as ordered and directed by the PROJECT <br /> MANAGER. The PROJECT MANAGER will designate the work to be performed and the order <br /> in which it is to be done, and WILL inspect all work. The PROJECT MANAGER will maintain <br /> documentation of the work. <br /> Equipment Rental Documentation <br /> a. The PROJECT MANAGER will maintain a job diary to record daily activities, progress and <br /> accomplishments. <br /> b. At the close of each day's operations during which equipment rental work has been conducted <br /> under this specification, the PROJECT MANAGER shall prepare, in duplicate, a form entitled <br /> "Equipment Rental Record" listing the date, times and total hours (computed to the nearest <br /> one-half hour), each piece of equipment was operated in accordance with this specification. <br /> "Operation" means that time spent in performing work as well as time necessary for moving <br /> equipment around the work site when directed by the PROJECT MANAGER. However, <br /> "operation" does not include that time spent in transporting the equipment to the initial work <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.