Laserfiche WebLink
.APR 10 '96 03:42PM DIV/MINERRLS&GEOLOGY P.7f10 <br /> Coal Basin 1996 Run-Off Maintenance <br /> PKA-7-1012 <br /> Bid Schedule <br /> Item Description O.uentity* Unit Price Total Cost <br /> (estimated <br /> total units) <br /> 1 D7H Dozer/215 fhp equivalent 8 $ 1hr S <br /> w/operator including mob/demob <br /> la D7H Dozer/215 fhp equivalent 24 $ /hr <br /> w/operator <br /> 2 4168 backhoelloader or 74 fhp 8 $ /hr <br /> equivalent w/operator including <br /> mob/demob <br /> 2a 416B backhoe/loader or 74 fhp 24 $ Ihr $ <br /> equivalent w/operator <br /> 3 10 cubic yard on/off highway dump 8 $ /hr <br /> truck w/operator including mob/demob <br /> 3a 10 cubic yard on/off highway dump 8 $ /hr $ <br /> truck w/operator <br /> 4 12G motor grader or 135 fhp equivalent 8, $ /hr <br /> w/operator including mob/demob <br /> 4a 12G motor grader or 135 fhp equivalent 16 $ /hr $ <br /> w/operator <br /> 5 Prefabricated silt fence per lineal foot 100 $ /L. Ft. $ <br /> installed including mob/demob <br /> 5a Prefabricated silt fence per lineal foot 100 $ /L. Ft. $ <br /> installed <br /> B Straw Bales with rebar per bale 25 $ /bale <br /> installed including mob/demob <br /> 69 Straw Bales with rebar per bale 25 $ /bale $ <br /> installed <br /> GRAND TOTAL $ <br /> *For bid evaluation only, hours are NOT guaranteed <br /> Contractor Date <br /> Signature Phone <br /> Address Tax ID <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />