Laserfiche WebLink
' APR-23-96 07:48 AM GARY RINDERLE CONST 9704346510 P.02 <br /> Coal Basin 1996 Run-Off Maintenance <br /> PKA-7-1012 <br /> Bid Schedule <br /> Item Description Quantity* Unit Price Total Cost <br /> (estimated <br /> total units) <br /> 00 r $ 9 �0 °' <br /> 1 D7H Dozer/215 fhp equivalent 8 $ <br /> w/operator including mob/demob <br /> la D7H Dozer/215 fhp equivalent 24 $ 7S �� /hr <br /> w/operator u? <br /> 2 416B backhoe/loader or 74 fhp <br /> 8 S O °� /hr <br /> equivalent w/operator including <br /> mob/demob <br /> 24 $ 56 1hr 2 o d <br /> 2a 4168 backhoe/loader or 74 fhp <br /> $_ / <br /> equivalent w/operator <br /> 3 10 cubic yard on/off highway dump 8 $_ /hr <br /> truck w/operator including mob/demob 0-03a 10 cubic yard on/off highway dump $ <br /> $ �/D /hr 5 ��� <br /> truck w/operator <br /> $ /hr <br /> 4 12G motor grader or 135 fhp equivalent 8. <br /> $S=° S Fld � <br /> w/operator including mob/demob r <br /> 4a 12G motor grader or 135 fhp equivalent 16 $ <br /> mr So � S ��d <br /> w/operator <br /> 5 Prefabricated silt fence per lineal foot 100 8 <br /> Jr so L. Ft. <br /> installed including mob/demob tf <br /> 5a Prefabricated silt fence per lineal foot 100 Ste_/L• Ft. $ 3 <br /> so <br /> installed <br /> 6 Straw Bales with rebar per bale 25 S - /bale S <br /> installed including mob/demob <br /> 25 Oro ate <br /> 6a Straw Bales with rebar per bale <br /> $- 6 S f So �v <br /> installed <br /> $ S0,70 <br /> dr <br /> GRAND TOTAL <br /> *For bid evaluation only, hours are NOT guaranteed <br /> Contractor C r R �e �✓" Date `�' -2 3 ' 9e <br /> _ Phone 9 7O `f' ; <br /> Signature `/�✓ `, <br /> Address <br /> St/2 3 3 A-( Tax ID /a <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />