My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-07-22_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-07-22_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 5:25:41 PM
Creation date
10/22/2012 10:31:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/22/1996
Doc Name
Bid Documents (IMP) 1996 Maintenance Project
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/23/1996 10:22 9708583139 BOGUE FRUITA PAGE 02 <br /> Coal Basin 1096 Run-Off Maintenance <br /> PKA-7-1012 <br /> Bid Schedule <br /> Item Oescripdon Quantity* Unit Price Total Cost <br /> (estimated <br /> D8K/300 FHP total units) <br /> 1 fhp equivalent 8 8 1V7.00 /hr ;3 1, 6.QO`(A) <br /> w/operator including nab/demob or JD 85OB/150FHP 380.00 3,040.00 (a) <br /> DBK/300FHP <br /> le 1AIDoweaM fhp equivalent 24 S 85_ on jhr 3 7,ndn_nn (A) <br /> W./operator or JD850B/150FHP 145.00 3,480.00 (B) <br /> 416 70FHP 2i43.00 <br /> 2 /lo ackhoeadar or 74 fhp 8 S /hr $ 1,944.00 (A) <br /> equivalent w/operato6rBn��Ql�ding 239.00 1,912.00 (B) <br /> l�F� or 44Z2 __��SSFFFIP <br /> 2a 41-Wbackhos/loader or 74 fhp 24 S /hr Sl_65f;-no (A) <br /> equivalent w/operator or 426B/75FHP 76.00 1,824.00 (B) <br /> 3 10 cubic yard onloff highway dump 8 s 130.00 /hr 01,040.00 <br /> truck w/operstor including rnob/demob <br /> 3a 10 cubic yard on/off highway dump 8 S 51.00 Jhr S 4QR_nn <br /> 14 c0G/1150ppFi�ator <br /> 4 -U2G-motor grader or 135 fhp equivalent 8 3 225_Qn Ihr 6 1 Ann.nn <br /> w/operator Including mob/dernob <br /> 14OG/150FHP <br /> 4a V20-fnotor grader or 135 fhp equivalent 18 S /hr 4 10,237 On <br /> w/operator <br /> 5 Prefabricated silt fence per lineal foot 100 8 2.50 L. Ft. $� 250.00 <br /> installed Including nob/demob <br /> 5a Prefabricated silt fence per lineal foot 100 S 1.80 A. Ft, 4 18Q.00 <br /> installed <br /> 6 Straw Bales with rebar per bale 25 $ 20.00 /bale $ 500.00 — <br /> installed includdn9 mob/demob <br /> 6a Straw Bales with rebar per bale 25 b -00 /bale S 37s_nn <br /> installed <br /> GRAND TOTAL 013.001.0.0 (a) <br /> `-'or bid evaluation only, hours are NOT guaranteed or 16,041.00 (B) <br /> ;."ontractor BOGUS CONSTRUCTION. Date. <br /> Sic,nature one 970-858-,i1 nA <br /> AddressP.O. BOX 400 CTax ID 84-1012744,E <br /> FRUITA, CO 81521 <br /> THIS 61D 3CMEDULE MUST BE RETURNED WITH YOUR 810 <br /> Page 1 of 1 Pago <br />
The URL can be used to link to this page
Your browser does not support the video tag.