Laserfiche WebLink
44+125 to 47+000 Grade road surface to drain to outside edge of <br /> road uniformly. Excess graded material is to be pushed against <br /> inside of cut-slope at no steeper than 3h:ly. Graded bench is to <br /> be ripped to 8 inches. <br /> 47+000 to 48+000 Grade road surface to drain to outside edge of <br /> road uniformly. Excess graded material is to be pushed against <br /> inside of cut-slope at no steeper than 3h: ly. Graded bench is to <br /> be ripped to 8 inches. <br /> 48+000 to 48+130 Grade road surface to drain to outside edge of <br /> road uniformly. Excess graded material is to be pushed against <br /> inside of cut-slope at no steeper than 3h:ly. Graded bench is to <br /> be ripped to 8 inches. <br /> 48+130 Remove culvert, construct low-water crossing as <br /> per 23+020 specifications <br /> 48+130 to 48+180 Grade road surface to drain to outside edge of <br /> road uniformly. Excess graded material is to be pushed against <br /> inside of cut-slope at no steeper than 3h:ly. Graded bench is to <br /> be ripped to 8 inches. <br /> 48+180 Construct low water crossing. Dimensions of <br /> the crossing will be per cut out trench specifications, see 34+050. <br /> Place minimum of 6 inch diameter riprap in base of the crossing, <br /> and along side for 12 vertical inches. <br /> 48+180 to 49+100 Grade road surface to drain to outside edge of <br /> road uniformly. Excess graded material is to be pushed against <br /> inside of cut-slope at no steeper than 3h:ly. Graded bench is to <br /> be ripped to 8 inches. <br /> 49+100 to 50+150 Excavate 6 vertical feet from outside of road <br /> and backfill against inslope. Grade remaining bench -to direct <br /> drainage over new cut-slope. Rip remaining bench and cut-slope <br /> area to 8 inches. See 0+00 for specifications. <br /> 50+150 to 51+175 Grade road surface to drain to outside edge of <br /> road uniformly. Excess graded material is to be pushed against <br /> inside of cut-slope at no steeper than 3h:1v. Graded bench is to <br /> be ripped to 8 inches. <br /> 51+175 Remove culvert and fill from creek. Construct <br /> low water crossing as per 23+020 specifications. <br /> 51+175 to 54+000 Grade road surface to drain to outside edge of <br /> road uniformly. Excess graded material is to be pushed against <br /> inside of cut-slope at no steeper than 3h: ly. Graded bench is to <br /> be ripped to 8 inches. <br /> 54+000 Remove culvert and construct low water crossing <br /> as per 23+020 specifications. <br />