My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-10_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-06-10_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 6:44:36 AM
Creation date
10/22/2012 10:30:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/10/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 11, 1996 <br /> TO: All Bidders, Coal Basin Rock Dump Project <br /> FROM: Steve Renner, Project Manager <br /> RE: Amendment Number 1 to PKA-6-375 <br /> Thank you for attending the pre-bid meeting for the Rock Dump <br /> reclamation project on June 10, 1996. A revised Bid Schedule and <br /> a copy of the sign in sheet are attached. The following amendments <br /> and clarifications should be incorporated into the Invitation for <br /> Bid: <br /> 1. The borrow areas for the topsoil substitute shall be excavated <br /> in the following order: <br /> A) Road B (main road west of Rock Tunnel entries) <br /> outslopes from west to east; <br /> B) Road A outslope (main road downstream of Dutch Creek <br /> culvert crossing to rock dump) ; <br /> C) Bench outslope south west of the lock Tunnel entries. <br /> 2. Please provide a cost on tt attached revised Bid Schedule for <br /> three (3) tons per acre of This material will be in <br /> addition to the mulch required in Task 5, Revegetation, of the <br /> Invitation to Bid. The price should include the cost to purchase, <br /> deliver and work this material completely into the topsoil and <br /> topsoil substitute after it is placed on the dump by discing or <br /> furrowing. The use of this material is NOT guaranteed. Payment <br /> will be made on a per acre basis, and will constitute full payment <br /> for materials, labor and all incidental costs. <br /> 3 . Receipt and acceptance of this amendment shall be acknowledged <br /> on the bid form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.