Laserfiche WebLink
Coal Basin / Waste Rock Dump Reclamation Project <br /> C-81-017 <br /> BID SCHEDULE <br /> Task Description Qty. Unit Unit price Amount <br /> 1 Mobilization/Demobilization per 1 Job N/A $ <br /> specifications <br /> 2 Silt Fence, Installed, per specs 1,000 Ln. Ft. $ $ <br /> 3 Earth Work, per specifications 1 Job N/A $ <br /> 4 Equipment Rental, per <br /> specifications <br /> a Bulldozer w/ operator Hours $ $ <br /> b Backhoe Loader w/ operator 24 Hours $ S <br /> c 5 cubic yard on/off highway 20 Hours $ $ <br /> dump truck, w/operator <br /> 5 Revegetation, per specifications 17 Acres $ $ <br /> GRAND TOTAL (Enter here and on Bid) $ <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />