Laserfiche WebLink
07/15/1996 10:14 3038242709 PAGE 01 <br /> .1 <br /> CONSTRUCTION <br /> General Excavations 274 CR #39 — Hamilton, CO 81638 Sand and Gravel Hauling <br /> Snow Removal Reservoirs & Stock Ponds <br /> Demolitions (303) 824-2709 Drilling & Blasting <br /> PAGE ONE <br /> CONSTRUCTION SCHEDULE 07-15-96 <br /> COAL BASIN, ROCK DUMP <br /> MOBILIZATION WILL COMMENCE UPON RECEIPT OF NOTICE TO PROCEED. AN <br /> ANTICIPATED DATE FOR THIS TASK IS THE WEEK OF MONDAY, JULY 22ND 1996. <br /> TASK 2, SILT FENCES AND TASK NUMBER 3 WILL PROCEED UPON MOBILIZATION <br /> AND SHOULD BE COMPLETE BY 07-29-96. <br /> DURING THE REGRADING OPERATIONS THE INSPECTED AND APPROVED SLOPES <br /> SHALL BEGIN TO RECEIVE TOPSOIL FROM THE DESIGNATED TOPSOIL PILES. <br /> UPON EXPENDING THE AVAILABLE TOPSOIL, EXCAVATION OF ROAD BANKS WILL <br /> COMMENCE IN THE APPROPRIATE SEQUENCE AND TOPSOILING SHOULD BE <br /> COMPLETE BY 08-30-96. <br /> REVEGITATION WILL COMMENCE AFTER APPROVAL OF TOPSOILING EFFORTS ARE <br /> COMPLETE AND SHOULD BE DONE WITHIN THE ALLOTED AMOUNT OF TIME. <br /> DUE TO APPORTIONED TIME FOR EQUIPMENT RENTAL BEING AT THE PROJECTS <br /> MANAGER'S DIRECTION, SCHEDULING FOR THIS TASK IS NOT INCLUDED IN THIS <br /> REPORT. UPON THE MANAGER'S ADVISEMENT OF DUTIES FOR THE EQUIPMENT <br /> RENTAL, SCHEDULING THIS TASK WILL BE COMPLETED AT A LATER DATE. <br />