My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-11_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-06-11_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 6:58:34 AM
Creation date
10/22/2012 10:30:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/11/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> Roy Romer <br /> DATE: June 11, 1996 Governor <br /> James S.Lochhead <br /> Executive Director <br /> TO: All Bidders on the Coal Basin/Rock Dump Project Michael S.Long <br /> Division Director <br /> FROM: Steve Renner, Division of Minerals and Geology <br /> RE: Amendment No 1. to PKA-6-375 <br /> Thank you for your interest and participation in the pre-bid meeting. The following <br /> clarifications and amendments should be noted and incorporated into the bid documents: <br /> 1 . The borrow areas for the"topsoil substitute shall be excavated in the following order: <br /> A) Road B (main road west of Rock Tunnel entries) outslopes from west to east; <br /> B) Road A outslope (main road downstream of Dutch Creek culvert crossing to <br /> rock dump); <br /> C) Bench outslope south west of the Rock Tunnel entries. <br /> 2. Please provide a cost on the attached revised Bid Schedule for three (3) tons per acre <br /> of native grass hay. This material will be in addition to the mulch required in Task 5, <br /> Revegetation, of the Invitation to Bid. The price should include the cost to purchase, <br /> deliver and work this material completely into the topsoil and topsoil substitute after it <br /> is placed on the dump by discing or furrowing. The use of this material is NOT <br /> guaranteed. Payment will be made on a per acre basis, and will constitute full <br /> payment for materials, labor and all incidental costs. <br /> 3. All terms and conditions of the Invitation and Bid other than as changed by this <br /> amendment remain the same. <br /> 4. Receipt and acceptance of this amendment shall be acknowledged on the bid form. <br /> mAimp\YJb\amend1.rk <br />
The URL can be used to link to this page
Your browser does not support the video tag.