SITE CLASSIFICATIONS
<br /> Erosion impact of the roll ditch sites has been classified into 5 groups. Class 1 had no
<br /> problems with erosion. Class 2 had some minor erosion,but is not in danger of further activity.
<br /> Class 3 has potential for further erosion,but very minor repairs will correct the problem. Class 4
<br /> has potential for further erosion and will require more labor intensive efforts to correct. Class 5
<br /> are major problems for further erosion and will require some re-engineering and thought.
<br /> 129 sites were evaluated for erosion impact. Of the 129 sites 62 or 48 %were Class 1.
<br /> 33 or 25.6 %were Class 2. 11 or 8.5 %were Class 3. 12 or 9.4 %were Class 4. 11 or 8.5 %were
<br /> Class 5. The following table is a site by site break down into the classifications.
<br /> CLASS 1 CLASS 2 CLASS 3 CLASS 4 CLASS 5
<br /> F-1,2,F-4,F-6,7,8 F-5,F-12,13,F-21, F-25,F-26,F-32 F-3,F-9,F11,F-19 F-20,F-27,F-28,F-31
<br /> F-10,F-14,15,16,17, 22,23,24,F-39, F-35,F-38,G-6, F45,G-18,G-21, F-36,G-8,G-9,G-19
<br /> 18a&b,F-30,F-33 F42,F43a&b, G-11,G-14,G-25 G-22a&b G-23,G-28b,G-30a
<br /> F-34,F-37,F-40,41 F-48,F-56, G-1 G-25,G-31a,E-17 G-24,G-26a,G-35
<br /> F-46,47,49,50 G-3 ,4, 5a&b,
<br /> F-52, 53, 54, 55 G-10,G-15, 16, 17
<br /> G-2,G-7,G-12, 13, G-20b,G-28 G-31,
<br /> G-19b,G-20,G-24b E-8,E-1lb E-12,
<br /> G-26b,G-27, E-19a,b,c,E-20
<br /> G-30a&b,G-32a&b,
<br /> G-34, 36,37, 38, 39
<br /> E-lthrul0
<br /> E-I le,E-13 thru 16
<br /> E-18
<br /> From this classification 95 sites or 73.6 %have performed as hoped. 11 sites are quick
<br /> fixes. 23 site will need work that will require some thought. A 17.9 % failure rate under above
<br /> average conditions is not bad.