Laserfiche WebLink
Item <br />Description <br />Qty. <br />Unit <br />Unit Price <br />Amount <br />1 <br />Mobilization/ <br />Demobilization per <br />specifications <br />1 • <br />• Job <br />N/A <br />$ 11, 000.00 • <br />2 <br />Demolition, per <br />specifications <br />1 <br />Job <br />N/A <br />$ 20, 380.50 <br />3 - <br />Silt fence, installed <br />1,500 <br />Ln.- Ft. <br />$ 2.00 <br />••$ 3,000.00 <br />4 <br />Earth Work, per specifications <br />a <br />Mine 1 Fan <br />1 <br />Job <br />N/A <br />$ 4,815.00 <br />b <br />Mine 1 Fan Access Road <br />1 <br />Job <br />N/A <br />$ 3,375.00 <br />c <br />Mine 1 Yard <br />1 <br />Job <br />N/A <br />$ 6,750.00 <br />d <br />Mine 1 <br />1 <br />Job <br />N/A <br />$ 19,020.00 <br />e <br />Mine 2 <br />1 <br />Job <br />N/A <br />$ 15,•w_nn <br />f <br />Mine 2 Conveyor <br />1 <br />Job <br />N/A <br />$ 6,750.00 <br />g <br />Mine 2 Bathhouse Area <br />1 <br />Job <br />N/A <br />$ 30,600.00 <br />h <br />Mine 2 Fan <br />1 <br />Job <br />N/A <br />$ 2,700.00 <br />i <br />Mine 2 Fan Access Road <br />1 <br />Job <br />N/A <br />$ 8,750.00 <br />j <br />Coal Silo Area <br />1 <br />Job <br />N/A <br />S 9,000.00 <br />k <br />Lower Bench Area <br />1 . <br />Job <br />N/A • <br />$ 11,290:00 <br />5 • <br />Surface Drainages: <br />Furrows, per <br />specifications <br />1,445 <br />Ln. Ft. <br />$ 2.50 <br />$ ' 612 0 <br />, <br />6 <br />Surface Drainages: Rolling Dips -- DELETED <br />7 <br />Surface Drainages: Cut- <br />Out Trenches per <br />specifications <br />1445 <br />Ln. Ft. <br />$ 2.50 <br />$ 3,612.50 <br />SUBTOTAL (Enter here and on BID SCHEDULE, Page 2) $ 159,975.50 <br />Coal Basin /Mines 1 & 2 Reclamation Project <br />PKA -6 -364 <br />REVISED BID SCHEDULE <br />September 26, 1995 <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 1 of 2 Pages <br />