Laserfiche WebLink
,OCT.18 '95 11:42AM DIV /MINERALS &GEOLOGY <br />Coal Basin/Mines 1 & 2 Reclamation Project <br />PKA -6 -364 <br />REVISED BID SCHEDULE <br />GRAND TOTAL (Enter here and on Invitation and Bid Sheet) ' <br />$.2/7 910 <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 2 of 2 Pages ' <br />P.1/2 <br />September 26, 1995 <br />'° ' • ' 1 <br />Dciipton ' ' • Qty. <br />Unit <br />Unit Price Amoiunt' <br />SUBTOTAL. <br />(From BID SCHEDULE, Page 1) <br />$ 12o 7 D <br />8 <br />Equipment Rental (if require d) . <br />Bulldozer, per <br />specifications <br />40 <br />Hours <br />eel. <br />* 160 <br />$ 4 1 1 /1 60 <br />. • • <br />• <br />. Backhoa Loader, per <br />speOifications .. <br />20 <br />Hours <br />$ o . <br />. . <br />8 lotto ' <br />9 <br />Revegetation, per specifications <br />a <br />Steeper than 3H:1V <br />30 <br />Acres <br />$ <br />$ 7 o OD. <br />b <br />Flatter than 3H:1V - <br />_ 9 <br />Acres <br />$� <br />$ 2_ e o e <br />, <br />10 <br />Additional furrow <br />construction <br />600 <br />Ln. Ft. <br />$ <br />' $ - -- "- - <br />. <br />11 <br />Additional rolling dip <br />construction <br />DELETED <br />12 <br />Additional cut -out trench <br />construction <br />100 <br />Ln. Ft. <br />° <br />$ <br />$ 160 ` <br />. <br />13 <br />Additional silt fence, <br />installed <br />2,000 <br />Ln. Ft. <br />8 / - <br />$$44e <br />,OCT.18 '95 11:42AM DIV /MINERALS &GEOLOGY <br />Coal Basin/Mines 1 & 2 Reclamation Project <br />PKA -6 -364 <br />REVISED BID SCHEDULE <br />GRAND TOTAL (Enter here and on Invitation and Bid Sheet) ' <br />$.2/7 910 <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 2 of 2 Pages ' <br />P.1/2 <br />September 26, 1995 <br />