Laserfiche WebLink
Item <br />Description <br />Qty. <br />Unit <br />Unit Price <br />Amount <br />SUBTOTAL (From BID SCHEDULE, Page 1) $ <br />8 <br />Equipment Rental (if required) <br />Bulldozer, per <br />specifications <br />40 <br />Hours <br />$ <br />$ <br />Backhoe Loader, per <br />specifications <br />20 <br />Hours <br />$ <br />$ <br />9 <br />Revegetation, per specifications <br />a <br />Steeper than 3H:1V <br />30 <br />Acres <br />$ <br />$ <br />b <br />Flatter than 3H:1V <br />9 <br />Acres <br />$ <br />$ <br />10 <br />Additional furrow <br />construction <br />600 <br />Ln. Ft. <br />$ <br />$ <br />11 <br />Additional rolling dip <br />construction <br />DELETED <br />12 <br />Additional cut -out trench <br />construction <br />100 <br />Ln. Ft. <br />$ <br />$ <br />13 <br />Additional silt fence, <br />installed <br />2,000 <br />Ln. Ft. <br />$ <br />$ <br />Coal Basin/Mines 1 & 2 Reclamation Project <br />PKA -6 -364 <br />REVISED BID SCHEDULE <br />September 26, 1995 <br />GRAND TOTAL (Enter here and on Invitation and Bid Sheet) $ <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 2 of 2 Pages <br />