Laserfiche WebLink
September 26, 1995- <br /> Coal Basin/Mines 1 & 2 Reclamation Project <br /> PKA-6-364 <br /> REVISED BID SCHEDULE <br /> Item" Description " Qty. Unit Unit Price Amount' <br /> SUBTOTAL (From BID SCHEDULE, Page 1) $ 12 p SI cam' <br /> 8 Equipment Rental (if required) <br /> Bulldozer, per 40 Hours S_160� SyoBD <br /> specifications ' <br /> Backhoe Loader, per 20 Hours S p $ /060 J <br /> specifications " . <br /> 9 Revegetation, per specifications <br /> a Steeper than 3H:1 V 30 Acres $ .2 $ 7z poc>a, <br /> b Flatter than 3H:1 V 9 Acres $ IS)h-D n-m $ zg c <br /> 10 Additional furrow 600 Ln. Ft. $_9 p0 � <br /> construction <br /> 11 Additional rolling dip DELETED <br /> construction <br /> 12 Additional cut-out trench 100 Ln. Ft. $ / $ /be � <br /> construction <br /> 13 Additional silt fence, 2,000 Ln. Ft. $_ 0 $3600 <br /> installed <br /> GRAND TOTAL (Enter here and on Invitation and Bid Sheet) '79 0 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 2 of 2 Pages <br />