My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (192)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (192)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:04:11 AM
Creation date
10/22/2012 10:29:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Operation" means that time spent in performing work as well as time necessary <br /> for moving equipment around the work site when directed by the PROJECT <br /> MANAGER. However, "operation" does not include that time spent in transporting <br /> the equipment to the initial work site, removing the equipment when all work had <br /> been completed,transporting the equipment away from and returning it to the work <br /> site in the event of a temporary or seasonal suspension of operation, maintenance <br /> of the equipment, any time during which the equipment is "bogged down" or <br /> otherwise not working, nor for any periods when operations are suspended by the <br /> OWNER. <br /> C. After completion of the "Equipment Rental Record" form, the PROJECT MANAGER <br /> will obtain the concurrence of the CONTRACTOR as to time and hours each piece <br /> of equipment was actually operated in conformance with this specification and <br /> furnish a copy of each day's "Equipment Rental Record" form to the CONTRACTOR. <br /> 19.4 MEASUREMENT AND PAYMENT <br /> The number of hours each piece and type of equipment used as directed by the PROJECT <br /> MANAGER under this specification will be counted to the nearest one-half hour. Payment will <br /> be made at the unit price established by the Invitation and Bid Sheet and in the purchase order <br /> contract for supplemental earthwork for each piece and type of equipment. Such payment <br /> shall include the cost of all materials, accessories, labor, maintenance, operating supplies, <br /> salaries of operators, and any other expenses incidental to the operation of the equipment in <br /> the performance of work in accordance with this specification and bid item(s). No extra <br /> payment will be made for the use of the same equipment while performing work on other bid <br /> items on the Invitation and Bid Sheet, Bid Schedules or Purchase Order Contract. No <br /> additional payment will be made for hauling equipment to or away from the work site except <br /> as may be proper under Mobilization/Demobilization. <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.