Laserfiche WebLink
September 26, 1995 <br /> Coal Basin/Mines 1 & 2 Reclamation Project <br /> PKA-6-364 <br /> REVISED BID SCHEDULE <br /> Item Description Qty. I Unit Unit Price Amount <br /> SUBTOTAL (From BID SCHEDULE, Page 1) $ <br /> 8 Equipment Rental (if required) <br /> Bulldozer, per 40 Hours $ $ <br /> specifications <br /> Backhoe Loader, per 20 Hours $ $ <br /> specifications <br /> 9 Revegetation, per specifications <br /> a Steeper than 3H:1 V 30 Acres $ $ <br /> b Flatter than 3H:1 V 9 Acres $ $ <br /> 10 Additional furrow 600 Ln. Ft. $ $ <br /> construction <br /> 11 Additional rolling dip DELETED <br /> construction <br /> 12 Additional cut-out trench 100 Ln. Ft. $ $ <br /> construction <br /> 13 Additional silt fence, 2,000 Ln. Ft. $ $ <br /> installed <br /> GRAND TOTAL (Enter here and on Invitation and Bid Sheet) $ <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 2 of 2 Pages <br />