Laserfiche WebLink
TUN 12 '96 02:53PM DIWMINERALS&GEOLOGY P.3{4 <br /> ERM EnviroClean-Rocky Mountain,Inc. <br /> Goal Basin/Rock Tunnel Project <br /> C-81-017 <br /> REVISED BID SCHEDULE <br /> PKA-3-372 <br /> Task Description Qty. Unit Unit Price Amount <br /> 1 Mobilization/Demobilization per <br /> 1 ,lob N/A $ 6, 580.00 <br /> specifications <br /> 2 Demolition, per specifications <br /> 1 Job N/A 418,580.00 <br /> T <br /> 3 Silt Fence, Installed, per specs 500 Ln. Ft. $ 0 .94 $ Z2--0- - <br /> 4 Block Wells, installed, per specs <br /> 2 Job N/A $ 4,350.00 <br /> 5 Earth Work, per specifications <br /> 1 Job NIA $12, 064.00 <br /> 6 Surface Drainage: Rock Tunnel <br /> Discharge <br /> 165 Ln, Ft. $71.0 0 $1 1 , 71 5.0 0 <br /> a PVC Pipe Installation, per specs <br /> , <br /> S00 Ln. Ft. $7, 240.00 <br /> b Install Surface Channel, per specs <br /> $9.05 <br /> 7 Surface Drainage: Contour Furrows, 600 Ln. Ft. S 1 5 $4,, 890-00 <br /> per specs _ <br /> 8 Equipment Rental, per specifications <br /> a Bulldozer, w/operator, per specs 10 Hours $1 2 0.0 $1 . 2J, 0 0.Q0 <br /> b Backhoe Loader, w/ operator, per 24 Hours $65.00 $1 ,560. 00 <br /> specs <br /> c 5 cubic yard on/off highway dump <br /> 20 Hours $5500 $1 , 100.00 <br /> truck, w/ operator, per specs <br /> 9 7 Acres $650.00 ' $4,5�0`00 <br /> Revegetation, per specs <br /> GRAND TOTAL <br /> ADDITIVE ALTERNATE <br /> 165 Ln. Ft. $ 71 .00 $ 11!71 5.00 <br /> Concrete Pipe Installation 525.00 3, 675.00 <br /> 5 tons per acre cow manure, 3 tons 7 Acres $ $�- <br /> per acre straw or hay installed <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />