My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-26_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-06-26_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 11:43:21 AM
Creation date
10/22/2012 10:28:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/26/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERCARGO INSURANCE COMPANY <br /> 1450 East American Lane •20th Floor <br /> Schaumburg, Illinois 60173-5458 <br /> 1-800-394-3924 <br /> LB06-00569 <br /> BOND NO. PUBLIC WORKS BID BOND <br /> KNOW ALL MEN BY THESE PRESENTS, That we (Insert the full name and address of the principal below) <br /> hereinafter <br /> referred to Gary Rinderle Construction, Inc. <br /> as Principal,1 542 33 Road,Clifton, CO 81520-8023 <br /> and INTERCARGO INSURANCE COMPANY, a corporation, hereinafter referred to as Surety, organized and <br /> existing under the laws of the State of Illinois and authorized to do business in the State of Colorado <br /> are held and firmly bound unto (Insert the full name and address of the Obligee below) <br /> hereinafter <br /> referred to State of Colorado <br /> as Obligee, 1313 Sherman Street, Ste. 215, Denver, Colorado 80203 <br /> in the penal sum of (5%) of the amount of the Bid, not to exceed <br /> Twelve Thousand Five Hundred And No/100 Dollars Dollars <br /> ($ ***S 12,500.00 ) lawful money of the United States of America, for the payment of which sum, well and <br /> truly to be made, we bind ourselves our Executors, Administrators, Successors and Assigns, firmly by these presents. <br /> THE CONDITION OF THIS OBLIGATION IS SUCH, that, whereas the Principal has submitted or is about to submit a <br /> proposal to the Obligee on a contract for (Insert project description and location below) <br /> Demolition of Foundation & Regrading Mine Waste Pile Coal <br /> Basin-Rock Tunnel Project Location :Redstone,Colorado <br /> NOW,THEREFORE, if the contract is awarded to the Principal and the Principal has within such time as may be specified, <br /> entered Into the contract in writing, and provided a bond, with surety acceptable to the obligee for the faithful <br /> performance of the contract; or if the Principal shall fail to do so, pay to the Obligee the difference not to exceed the <br /> penalty hereof between the amount specified in the bid and such larger amount for which the Obligee may in good faith <br /> contract with another party to perform the work covered by the bid, then this obligation shall be void; otherwise to <br /> remain in full force and effect. <br /> Signed, sealed and dated this 30th day of May 19 96 <br /> (Sea/if applicable) Gar• Rinderle Construction, Inc. <br /> rint or typ name pri al) <br /> B <br /> (Witness) (;;011 / 5re'spresentbtive) <br /> �,p.eP 14 <br /> FQb me• 1 <br /> SEAL -: INTE� G .� A ANY <br /> i ( By: <br /> (Witness) ,',, ����1(lid� n,, <br /> Alilwltw. Stewart <br /> ISEAL(0@85ped) <br /> IHBBL-4(7/93) <br />
The URL can be used to link to this page
Your browser does not support the video tag.