Laserfiche WebLink
ERM EnviroClean-Rocky Mountain,Inc. <br /> Coal Basin/Rock Tunnel Project <br /> C-81-017 <br /> REVISED BID SCHEDULE <br /> PKA-3-372 <br /> Task Description Qty. Unit Unit Price Amount <br /> 1 Mobilization/Demobilization per 1 Job N/A $ 6, 580. 00 <br /> specifications <br /> 2 Demolition, per specifications 1 Job N/A $ 1 8, 580.00 <br /> 3 Silt Fence, Installed, per specs 500 Ln. Ft. $ 0. 94 $ 470. 00 <br /> 4 Block Walls, Installed, per specs 2 Job N/A $ 4, 350. 00 <br /> 5 Earth Work, per specifications 1 Job N/A $ 1 2, 064. 00 <br /> 6 Surface Drainage: Rock Tunnel <br /> Discharge <br /> a PVC Pipe Installation, per specs 165 Ln. Ft. $71 . 00 $1 1 , 71 5. 00 <br /> b Install Surface Channel, per specs 800 Ln. Ft. $9. 0 5 $7, 2 4 0. 0 0 <br /> 7 Surface Drainage: Contour Furrows, 600 Ln. Ft. $8. 15 $4, 890. 00 <br /> per specs <br /> 8 Equipment Rental, per specifications <br /> a Bulldozer, w/operator, per specs 10 Hours $1 20. 00 $1 , 200. 00 <br /> b Backhoe Loader, w/ operator, per 24 Hours $6 5. 0 0 $1 , 5 6 0. 0 0 <br /> specs <br /> c 5 cubic yard on/off highway dump 20 Hours $55. 00 $1 , 1 00. 00 <br /> truck, w/ operator, per specs <br /> 9 Revegetation, per specs 7 Acres $650. 00 $4, 550. 00 <br /> GRAND TOTAL $74, ��� �0 <br /> ADDITIVE ALTERNATE <br /> Concrete Pipe Installation 165 Ln. Ft. $ 71 . 00 $ 11 , 715. 00 <br /> 525. 00 3, 675. 00 <br /> 5 tons per acre cow manure, 3 tons 7 Acres $ $ <br /> per acre straw or hay installed <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />