My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-10-15_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-10-15_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 12:13:07 PM
Creation date
10/22/2012 10:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/15/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERM EnviroClean <br /> Rocky Mountain, Inc. <br /> 5950 South Willow Drive <br /> Suite 206 <br /> FAX(970)241-1516 DMG Grand Junction Office Greenwood Village, <br /> - Colorado 80111-5144 - <br /> (303) 694-7390 <br /> (303) 733-2624(Fax) <br /> June 24, 1996 RECEIVED <br /> r� <br /> Mr. Steve Renner <br /> rJUN 2619% <br /> Division of Minerals and Geology DI VIS1()N OF <br /> Department of Natural Resources MINERALS & <br /> State of Colorado <br /> 1313 Sherman Street <br /> Denver,Colorado 80203 ERM <br /> Reference: Coal Basin Rock Tunnel Project PKA-6-372. Cost proposal for re- <br /> route of mine drainage 48-inch PVC Pipe and surface drainage cut. <br /> Dear Steve: <br /> Pursuant to your request,ERM EnviroClean-Rocky Mountain,Inc.Is pleased to present this <br /> revised cost proposal for the re-routing of the 48-inch PVC Coal Basin Rock Tunnel drainage pipe <br /> and associated surface drainage cuts. The cost proposal is based on your-sketches presented on <br /> 6/21/96 and 6/22/96 illustrating the revised PVC pipe layout and surface drainage cuts, <br /> respectively. <br /> The revised cost estimate is: _ <br /> • $11,115.00 for the 48-inch PVC pipe installation. The routing of the PVC pipe is essentially <br /> the same in total distance,but with one less 45-degree fitting. <br /> • . $5,890.00 for the revised routing of the surface drainage cuts(650 feet versus 800 feet). - <br /> Actual cost for construction of the surface drainage cut will be measured(by DMG)and <br /> invoiced at actual linear surface distance. <br /> • $1,657.00 for the anticipated subsurface demolition on concrete and other substructures . <br /> encountered during the construction of the re-routed 48-inch PVC drainage line and <br /> associated surface drainage cut on the north side of the lamp house. This cost item will not be , <br /> assessed if subsurface concrete and other substructures are not encountered during this <br /> activity. <br /> Should you have any questions,you may contact me at(303)694-7390 or at(800)669-7330. For <br /> your information,my mobile phone is (303)981-8010. <br /> Sincerely, <br /> an iroC lean-r Mou E <br /> nta' <br /> s,C Daniel S. H SP <br /> ei tden DOC: p:\EC\R\COLD-DMG\960007\960007.002 Page I <br /> A member of the Environmental <br /> �� `A, Resources Management Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.