My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-10-15_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-10-15_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 12:13:07 PM
Creation date
10/22/2012 10:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/15/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul 21,'96 Jul 28,'96 1 Aug 4,'96 <br /> ID Task Name Duration Start Finish S S I M T W T I F S S M T W T F S I S I M I T W T F S S <br /> 1 PROJECT DURATION 15d 7/22/96 8/9/96 <br /> 2 <br /> 3 Project Start Od 7/22/96 7/22/96 ♦ 7/22 <br /> 4 <br /> 5 Mobilization 2d 7/22/96 7/23/96 <br /> 6 Demolition 1w 7/24/96 7/30/96 <br /> 7 Silt Fence Installation 2d 7/24/96 7/25/96 <br /> 8 Block Wall Construction 4d 7/26/96 7/31/96 <br /> 9 Surface Drainage 6d 7/29196 8/5/96 <br /> 10 PVC Pipe 4d 7/29/96 8/1/96 <br /> 11 Surface Drainage 4d 7/31/96 8/5/96 <br /> 12 Earth Work 1w 7/31/96 8/6/96 <br /> 13 Surface Drainage: Furrows 3d 8/5/96 8/7/96 <br /> 14 Revegetation 2d 8/7/96 8/8/96 <br /> 15 Demobilization 2d 8/8/96 8/9/96 <br /> 16 <br /> 17 Project Completion Od 8/9/96 8/9/96 ` 8/9 <br /> Task Summary Rolled Up Progress <br /> Project:Coal Basin Rock Tunnel Sch <br /> Date:6/27/96 Progress Rolled Up Task <br /> Milestone Rolled Up Milestone 0 <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.