My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-10-15_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-10-15_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 12:13:07 PM
Creation date
10/22/2012 10:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/15/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERM ENVIROCLEAN-ROCKY MOUNTAIN, INC. <br /> 5950 S. Willow Drive, Suite 206 <br /> Greenwood Village, CO 80111 <br /> (303) 694-7390 <br /> October 7, 1996 <br /> State of Colorado <br /> Attn: Jim McArdle Project ECOR960007.00 <br /> Division of Minerals & Geology <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Invoice for: Coal Basin Rock Tunnel <br /> Redstone, Colorado <br /> Contract No.: PKA-6-372 <br /> Unit % Complete Previously Invoice <br /> Task Price To Date Billed Amount <br /> Task 1 Mobilization/Demobilization $6,580.00 100.00% $4,386.23 $2,193.77 <br /> Task 2 Demolition $18,580.00 100.00% 18,500.00 80.00 <br /> Task 3 Silt Fence $0.94 0.00% 0.00 0.00 <br /> Task 4 Block Walls $4,350.00 100.00% 4,350.00 0.00 <br /> Task 5 Earth Work $12,064.00 100.00% 12,064.00 0.00 <br /> Task 6 Surface Drainage: Rock Tunnel <br /> 6a PVC Pipe Installation $11,715.00 100.00% 11,715.00 0.00 <br /> 6b Install Surface Channel $9.05 LF 800 5,430.00 1,810.00 <br /> Task 7 Surface Drainage: Contour Furrows $4,890.00 100.00% 0.00 4,890.00 <br /> Task 8 Equipment Rental <br /> 8a Bulldozer,w/operator $1,200.00 100.00% 0.00 1,200.00 <br /> 8b Backh a Loader,w/operator $1,560.00 100.00% 0.00 1,560.00 <br /> 8c 5 cy on/off highway dump truck,w/operator $1,100.00 100.00% 0.00 1,100.00 <br /> Task 9 Revegetation $4,550.00 i00.00% 0.00 4,550.00 <br /> Total Invoice $56,445.23 $17,383.77 <br /> P:\ec\r\coi"mg\90007\rev-inv.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.